The Shower Pan King -  Done right the first time! Done right EVERY time!




2013 black tumbled marble pan (before)
2013 black tumbled marble pan (before)
Started leaking within first month
During
Had to move drain at least 6 inches from wall.
During
After
After
Used 4x4 at a diagonal layout.
Santa Clara pan failed after 2 years
Poor pan liner install.
Santa Clara pan failed after 2 years
After
After
I became creative with glass tile on bench front.
Only done 3 years ago. (before)
The pan liner here was a coat of liquid membrane.
Only done 3 years ago. (before)
Vast improvement (after)
Vast improvement (after)
Happy YELP reviews
Tiled over fiberglass pan that buckled and leaked(before).
San Francisco Ingleside district.
Tiled over fiberglass pan that buckled and leaked(before).
After
After
Went with all white that illuminated the shower.
(Before)
1951 leaky pan in Westlake Daly City
(Before)
After
After
All white with stain proof grout that resembled a vinyl pan but customized
Before
Done only 5 years ago in Pacific Heights ,San Francisco.
Before
During
During
Mortar process.
After
Basically the same tile but better job
After
1928 round shower
1928 round shower
Re-done in 1975..bad color choice,
After
Found the right tile and color that tied into the period of the shower.
After
The rest of this shower.
The rest of this shower.
Round tiled pans are very rare.
Before
1955 shower in Greenbrae
Before
After
After
Found a close color and one happy YELP customer.
Before
Done only 4 years prior and caused dry rot damage.
Before
After
After
Customer wanted white 2x2 tile with white stain resistant grout.
1978 shower
Pacifica ,CA.
1978 shower
Completely restructured
Completely restructured
Dry rot extended beyond shower and carefully salvaged all of the floor textured brown tile from 1978.
After
floor back to original state and shower color close to original .A happy YELP customer.
After
Before
Before
Tiled over a 3 inch foam shower base kit .
Pan moved and created cracked grout lines.
After
Everything mortared with 1x1 colorful mosaic stone.
After
1931 before pic
1931 before pic
Marina district San Francisco
After results
Improved the design by balancing the layout.
After results
Same thing with the unit above
Same thing with the unit above
This was worse because of internal plumbing problems
After results.
Exact layout as the yellow one.
After results.
Before
Before
Limestone shower leaking after 3 years. Bad hot mop.
After
New ornate design
After
1948 shower pan
1948 shower pan
In bad shape where the hot mop membrane became brittle around the drain.
After
Almost a perfect color match using a retro layout.
After
1954 pan in Cupertino
1954 pan in Cupertino
Hop mop finally gave out.
After
Used maroon color liner to break up the colors and went with a borderless diagonal layout.
After
1951 So. San Francisco pan.
1951 So. San Francisco pan.
Galvanized metal pan rotted through.
After
Managed to salvage some of the old floor tile, detached the cement from the old tile and cut into 2x2 pieces to incorporate a neat symmetrical retro design.
After